claude-agent-verification
Files
SKILL.mdagentsreferences
Install
Install only this skill with npx skills
npx skills add alisonaquinas/llm-shared-skills --skill 'claude-agent-verification' -g -y
Install the containing skill bundle
/plugin install shared-skills@llm-skills
This skill is bundled inside shared-skills. Use
npx skills when you only want this skill, or install the bundle once to make every included skill available through the plugin marketplace flow. Browse the full skill bundle repository at github.com/alisonaquinas/llm-shared-skills.Invoke
Invoke this skill after installation
/shared-skills:claude-agent-verification
SKILL.md
name: claude-agent-verification description: > Verification phase for delegated agent workflow development. Use when planning, designing, building, testing, validating, or refining a delegated agent workflow as it moves through a full delivery lifecycle. Triggers include drafting the agent orchestration spec, locking contracts, wiring runtime placement, scoring quality, running live scenarios, or choosing the right re-entry point after a failure.
Agent Verification
Run the static and contract-level checks that confirm the implementation still matches the design.
Intent Router
Load reference files on demand only when the corresponding topic is active:
references/verification-checklist.md— Load when confirming role contracts, ownership boundaries, and fallback paths
Quick Start
[ ] Capture the current agent orchestration spec
[ ] Complete the required outputs for this phase
[ ] Record evidence for the gate
[ ] Hand off the evidence to the next phase
Phase Workflow
Start from the current agent orchestration spec and tighten only the decisions owned by this phase. Work forward until the gate is satisfied, then hand the evidence to the next phase in the family. Keep the workflow description portable even when the runtime wiring is specific to one environment.
Example Evidence
| Check | Status | Notes |
|---|---|---|
| Role contract matches design | PASS | |
| Required files present | PASS | |
| Ownership boundaries explicit | PASS | |
| Safety constraints enforced | PASS | |
Gate
Verification is complete when all required checklist items pass and no unresolved mismatch remains between design and implementation.
Safety Notes
Verification failures are upstream failures. Fix the underlying design or creation gap instead of papering over the mismatch.
Resource Index
| Reference File | Load When |
|---|---|
references/verification-checklist.md | Load when confirming role contracts, ownership boundaries, and fallback paths |