Skip to main content
Alison Aquinas logoAlison's LLM Skills Marketplace

claude-hook-verification

Included in skill bundleshared-skillsView on GitHub ↗

Files

SKILL.mdagentsreferences

Install

Install only this skill with npx skills
npx skills add alisonaquinas/llm-shared-skills --skill 'claude-hook-verification' -g -y
Install the containing skill bundle
/plugin install shared-skills@llm-skills
Download claude-hook-verification-skill.zip
This skill is bundled inside shared-skills. Use npx skills when you only want this skill, or install the bundle once to make every included skill available through the plugin marketplace flow. Browse the full skill bundle repository at github.com/alisonaquinas/llm-shared-skills.

Invoke

Invoke this skill after installation
/shared-skills:claude-hook-verification

SKILL.md


name: claude-hook-verification description: > Verification phase for hook automation rule development. Use when planning, designing, building, testing, validating, or refining a hook automation rule as it moves through a full delivery lifecycle. Triggers include drafting the hook spec, locking contracts, wiring runtime placement, scoring quality, running live scenarios, or choosing the right re-entry point after a failure.

Hook Verification

Run the static and contract-level checks that confirm the implementation still matches the design.

Intent Router

Load reference files on demand only when the corresponding topic is active:

  • references/verification-checklist.md — Load when confirming hook config, return shapes, and idempotency

Quick Start

[ ] Capture the current hook spec
[ ] Complete the required outputs for this phase
[ ] Record evidence for the gate
[ ] Hand off the evidence to the next phase

Phase Workflow

Start from the current hook spec and tighten only the decisions owned by this phase. Work forward until the gate is satisfied, then hand the evidence to the next phase in the family. Keep the workflow description portable even when the runtime wiring is specific to one environment.

Example Evidence

| Check | Status | Notes |
|---|---|---|
| Event contract matches design | PASS | |
| Required files present | PASS | |
| Return decisions documented | PASS | |
| Safety constraints enforced | PASS | |

Gate

Verification is complete when all required checklist items pass and no unresolved mismatch remains between design and implementation.

Safety Notes

Verification failures are upstream failures. Fix the underlying design or creation gap instead of papering over the mismatch.

Resource Index

Reference FileLoad When
references/verification-checklist.mdLoad when confirming hook config, return shapes, and idempotency
← Back to marketplace